Edit Retention % Button

Top  Previous  Next

This button allows you to change the retention percentage on ALL contract billing item or subcontractor payment sheet items on a single job without editing each individual item.  This feature makes it easier to update items whenever the retention percentage has been adjusted in the middle of a project.  For example, on some state and federal projects, the retention percentage is reduced from 10% to 5% when the project is 50% complete.  

 

Follow these steps to use the Edit Retention % Button:

 

Select the desired job from the job list and click the Edit Button at the top of the screen.

 

Click on the Detail Items Tab and click on the Edit Retention % Button at the bottom of the screen.

 

The Change Item Retention Percentages Screen will be loaded and all of the contract billing items will be displayed for the current job. Note: Click on the Sub Payment Items option in the Item Type box to display subcontractor payment sheet items.  

 

Set the desired retention percentage and then click on the Update Retention Percentages Button to make the changes. All applicable items on the job will be updated with the new retention percentage

 

Click on the Done Button to close the screen and return to the Job List.

 

At this point, a new contract billing can be created that will bill out the change in retention withheld.  When a new billing is created, the system will notify you that the retention percentages have changed since the last billing and will ask if you want to recalculate the retention amount on the current billing.  If you answer yes, then a billing will be created based on the last percentages complete and retention withheld will be calculated based on the new retention percentage.  The difference between the retention withheld previously and the retention currently calculated will be the amount of the new invoice.